Australia's Fortescue delays again first production at Iron Bridge project
Adds details on delay
March 28 (Reuters) -Australia's Fortescue Metals Group FMG.AX said on Tuesday first production at the company's Iron Bridge Magnetite Project in Pilbara, Western Australia, has been revised to the second half of April.
The company had said in January the project was set to begin production at the end of the March quarter.
On Tuesday, the world's No. 4 iron ore miner said the project continues to make progress while managing weather impacts on activity and infrastructure at the site.
The Iron Bridge project, which is key to Fortescue's growth strategy, has faced several issues since its announcement, including the exit of its chief operating officer Greg Lilleyman and two other executives after delays and cost overruns in 2021.
The capital estimate for the project remains unchanged at $3.9 billion, with Fortescue's share at about $3.0 billion, it said.
Reporting by Echha Jain in Bengaluru; Editing by Devika Syamnath and Uttaresh Venkateshwaran
면책조항: XM Group 회사는 체결 전용 서비스와 온라인 거래 플랫폼에 대한 접근을 제공하여, 개인이 웹사이트에서 또는 웹사이트를 통해 이용 가능한 콘텐츠를 보거나 사용할 수 있도록 허용합니다. 이에 대해 변경하거나 확장할 의도는 없습니다. 이러한 접근 및 사용에는 다음 사항이 항상 적용됩니다: (i) 이용 약관, (ii) 위험 경고, (iii) 완전 면책조항. 따라서, 이러한 콘텐츠는 일반적인 정보에 불과합니다. 특히, 온라인 거래 플랫폼의 콘텐츠는 금융 시장에서의 거래에 대한 권유나 제안이 아닙니다. 금융 시장에서의 거래는 자본에 상당한 위험을 수반합니다.
온라인 거래 플랫폼에 공개된 모든 자료는 교육/정보 목적으로만 제공되며, 금융, 투자세 또는 거래 조언 및 권고, 거래 가격 기록, 금융 상품 또는 원치 않는 금융 프로모션의 거래 제안 또는 권유를 포함하지 않으며, 포함해서도 안됩니다.
이 웹사이트에 포함된 모든 의견, 뉴스, 리서치, 분석, 가격, 기타 정보 또는 제3자 사이트에 대한 링크와 같이 XM이 준비하는 콘텐츠 뿐만 아니라, 제3자 콘텐츠는 일반 시장 논평으로서 "현재" 기준으로 제공되며, 투자 조언으로 여겨지지 않습니다. 모든 콘텐츠가 투자 리서치로 해석되는 경우, 투자 리서치의 독립성을 촉진하기 위해 고안된 법적 요건에 따라 콘텐츠가 의도되지 않았으며, 준비되지 않았다는 점을 인지하고 동의해야 합니다. 따라서, 관련 법률 및 규정에 따른 마케팅 커뮤니케이션이라고 간주됩니다. 여기에서 접근할 수 있는 앞서 언급한 정보에 대한 비독립 투자 리서치 및 위험 경고 알림을 읽고, 이해하시기 바랍니다.